Chinese English ¼òÌåÖÐÎÄ°æ
CONSUMPTION

Friendship link

  • www.prodrill.com.cn
  • Home >> APPLICATION >> CONSUMPTION

    STANDARD QUANTITY

    The quantity of PROSTAR to be used for cracking differs with the hole diameters and spacing. In Table 1, the relation between the quantity of PROSTAR used and the hole diameters is indicated for a hole of 1 meter in length, where PROSTAR was mixed at a water ratio of 30%.
    Table 1: QUANTITY OF PROSTAR   used per hole length and hole diameters

    Hole diameter

    (mm)

    36

    38

    40

    42

    44

    46

    48

    50

    PROSTAR

    (kg/m)

    1.7

    1.9

    2.1

    2.3

    2.5

    2.8

    3.0

    3.2

    Hole diameter

    (inch)

    13/8

    11/2

    15/8

    13/4

    17/8

    2

    PROSTAR

    (ib/yd)

    3.1

    3.7

    4.4

    5.1

    5.8

    6.7

    5 kgs of PROSTAR is usually used in case 1m3 of virgin rock is demolished(8.4 lb/yd3)
    For fragmentarion and reinforced concrete, an amount 2 to 4 times that is required.

    USAGE VARIANCE

    This varies with the the material of the objects to be cracked or the break plan. Refer to table-2 as a guide line.

    Table 2: Quantity of PROSTAR used per 1 m3

    Kinds of Objects to be demolished

    Standard Quantity of PROSTAR per 1m3

    ROCKS

    Soft Rock

    5-8 kg  (11-17.6 lb)

    Medium Rock

    8-12 kg £¨17.6-26.4 lb£©

    Hard Rock

    12-20 kg  (26.4-44 lb )

    CONCRETE

    Plain Concrete

    5-8 kg  (11-17.6 lb)

    Reinforced Concrete

    Concrete including less quantity of re-bars

    10-25 kg£¨22-55 lb£©

    Concrete including much quantity of re-bars

    20-35 kg  (44-77 lb)

    BRICKS

    Anti-fire brick

    10-25 kg  (22-55 lb)

    £ª When an object with two or more free surface is demolished prefectly, the quantity of PROSTAR shown in the above Table is required.
    £ª In case of demolition of boulders or bed rock, the required quantities of PROSTAR are 80%or 110% of indicated quantity in the above table, respectively .
    £ª In case of demolishing an object which has only one free surface or partical demolition etc. to smallersized blocks, the required quantities of PROSTAR increase in comparison with those shown in the above table.